Post Date: 13 December 2014
In September 2014, Mitchel Hanlon Consulting (MHC) was engaged by John Holland Rail Country Rail Network (JHR CRN) to provide survey and design services for the track upgrade of the Yanco to Griffith railway line. The section distance was 55 km.
The principal consideration in the tender brief was to design the track to a standard that would permit trains to generally operate at a track speed of 80 km/hr.
Survey work commenced in October 2014 with final project delivery in December 2014.
The work to complete the project comprised of :