June 2015 saw Mitchel Hanlon Consulting (MHC) complete 150 km of survey control traversing and 100 km of track survey and design for John Holland Rail Country Rail Network (JHR CRN).
The tender brief required the track design be applied that would allow trains to operate at a track speed of 80 km/hr but where track lateral shifts or “pull” would be minimal. At times, this was difficult to achieve as the original alignment was designed for the steam era and some sections of track were a serious of reverse curves with no intermediate straight section in which superelevation or cant could be transitioned.
The work to complete the project comprised of:
Survey work commenced in February 2015 with final project document delivery in August 2015.